HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

**Pipeline network: 873.502 million yuan for the Heihe–Daqing natural gas pipeline project

2025-12-26View Original

Thread Content

Project Name: Heihe-Daqing Gas Pipeline Project
Launch Date: December 26, 2025
Region: Heilongjiang
Industry/Project Type: Mineral Mining and Processing/Petroleum and Natural Gas Exploration, Extraction, and Transportation/Petroleum and Natural Gas Storage and Transportation; Municipal facilities/gas and heat supply/gas pipeline network. Project owner: **Northeast Branch of PetroChina Pipeline Network Group Co., Ltd.** Total investment: 873,502 million yuan. Current progress: The project application report has been approved. Construction locations: Heihe City, Qiqihar City, Suihua City, and Daqing City in Heilongjiang Province, as well as 6 farms under the Beian Branch of Beidahuang Group and 2 farms under the Provincial Department of Justice. Scope of construction: The total length of the pipelines is approximately 580 km, with diameters of D1422 mm/D1219 mm; the design pressure is 12 MPa. The section from valve room No. 0 to the first station in Heihe is approximately 9.6 km long with a diameter of D1422 mm, while the remaining sections have a diameter of D1219 mm. Progress milestone: December 24, 2025 – Approval regarding the authorization of the Heihe-Daqing gas pipeline project (approval of the project application report)
Reply #22025-12-26
【Ten Years of Rapid Development in Chemical Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #32025-12-26
【Ten Years of Rapid Development in Chemical Equipment】From 2018 to 2025, Shandong Zhanggu successfully developed its first domestically produced TEP steam compressor, which was then shipped out. https://bbs.hcbbs.com/thread-5709282-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
Reply #42025-12-26
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52025-12-27
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest single PEM hydrogen production electrolyzer was successfully produced at CRRC in Zhuzhou from 2921 to 2025. https://bbs.hcbbs.com/thread-5709309-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #62025-12-27
【Haichuan Equipment Guessing Game】Does anyone know it? ? What kind of storage tank is this? Why does it have such a structure inside? https://bbs.hcbbs.com/thread-5709647-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #72025-12-27
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at 10,000 revolutions per minute and motors with a vacuum distribution capacity of 100,000 have passed the evaluation tests. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #82025-12-27
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2024 to 2025! ! Two breakthroughs in domestic high-end electric drives: ultra-high-speed motors capable of operating at 10,000 revolutions per minute and motors with a vacuum distribution capacity of 100,000 have passed the evaluation tests. https://bbs.hcbbs.com/thread-5709405-1-1.html (Source: Haimen Chemical Industry Forum (HCBBS))
Reply #92025-12-28
【Ten Years of Rapid Development in Chemical Processing Equipment】From 2027 to 2025, Yanshan Petrochemical’s 1.2 million tons per year gasoline adsorption desulfurization unit became the first of its kind in China to receive carbon neutrality certification. https://bbs.hcbbs.com/thread-5709493-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #102025-12-28
【Ten Years of Rapid Development in Chemical Equipment】First of its kind in China from 2928 to 2025! Pilot production of Ordos’ “sand thermal battery” a success! https://bbs.hcbbs.com/thread-5709536-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #112025-12-28
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first large-scale perovskite building-integrated photovoltaic demonstration project was officially connected to the power grid from 2929 to 2025. https://bbs.hcbbs.com/thread-5709550-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.