Thread Content
Key project information: Project name – Renovation and upgrading of the old secondary heating networks at 20 heat exchange stations, including those in Huairen City. Tendering entity: Huairen City Heating Assurance Center. Total investment: 100.312 million yuan. Tendering date: Expected to be in May 2026. Scope of the tender: Design, construction, supervision, and procurement of key materials. Locations covered (20 heat exchange stations): Daxiu Factory Station, Luzigou Station, State Taxation Station, Mining Station, No. 5 Middle School Station, County Hospital Station, Xiaoshulin North Station, Xiaoshulin East Station, Traditional Chinese Medicine Hospital and Old Bus Station, Yunfeng Station, Zhifengshan Station, Zhifengshan Box Station, Teachers’ Garden Station, Railway Station, Mining Machinery Station, No. 1 Middle School Station, Health Bureau Station, Tai’anmen Station, Yunxin Jiayuan Station, etc. Construction scale: Upgrade of secondary pipeline network with diameters ranging from DN32 to DN400. Pipeline length: 2×32.483 kilometers (approximately 65 kilometers of dual-pipe system). Pipe material type: Pre-fabricated, directly-buried insulated steel pipes. Supporting facilities: 593 metering box wells for individual units; 197 metering box wells for users; road restoration area: 64,809 square meters
【Hechuan Modular Installation Discussion】Summary post – everyone is welcome to join the discussion! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=1773168 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Haichuan Chemical History】Summary Post--Viewing Development Through History! Continuously being updated! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718076 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3088-2026: China’s first demonstration project for producing high-quality synthetic crude oil using green hydrogen in combination with low-quality heavy oil has been launched. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718140 (Source: Haichuan Chemical Industry Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – The gas supply for automated instruments is connected to the instruments without filtration or pressure reduction https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718231 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Common Issues in Haichuan Pipeline Design】Selection of hoses and valves at the utility material hose stations, as well as details regarding piping and installation https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718254 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The world’s largest opening – 8.6-meter molten salt tank-type collector systems and related processes have completed their technical validation: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718280 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Instruments at the Site Are Difficult to View https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718298 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The “high-efficiency hydrogen production and hydrogenation integrated unit” technology developed by Dalian Institute of Chemical Physics from 2031 to 2026 passed the evaluation for scientific and technological achievements. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718315 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】From 2032 to 2026, China has made significant breakthroughs in proprietary technologies in key areas of aromatic hydrocarbon production, reaching an internationally leading level overall. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718371 (Source: Haichuan Chemical Industry Forum (HCBBS))