HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

In PLAN52, the top vent is kept open in the centrifugal pump seal flushing scheme – so what is the purpose of installing a pressure gauge?

2020-09-27View Original

Thread Content

In the PLAN52 scheme, the top vent is normally open, and there is also a small fitting similar to a safety valve at the outlet that opens when the pressure exceeds 0.02. So what is the purpose of installing a pressure gauge in this case? Does this have high liquid level, low liquid level, and high pressure alarms? Why is there pressure? If there’s pressure, isn’t it simply vented directly?
Reply #22020-09-30
What is the PLAN52 plan?
Reply #32020-10-06
Some have recovery pipelines, and an increase in pressure indicates that the pipeline is blocked

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.