HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Regular procedures for the pre-shift and post-shift meetings of the instrumentation team

2026-05-05View Original

Thread Content

This post was last edited by HaiChuanLaoYu on 2026-5-5 08:10. The pre-shift and post-shift meetings for the instrumentation team are important elements in ensuring a systematic approach to instrument maintenance. Pre-shift meetings focus on \"task assignment and risk prevention,\" while post-shift meetings focus on \"task review and issue analysis.\" The specific procedures are as follows: I. Procedures for the instrumentation team’s pre-shift meeting (10–15 minutes) Core objectives: clarify daily tasks, identify risks, assign responsibilities, and ensure that work is carried out in an orderly manner. 1. Personnel sign-in and status verification (1–2 minutes): The team leader takes attendance, confirms who is present, and asks about the physical/mental state of team members (to prevent fatigue or working while ill) ; Check whether the qualifications of special operation personnel (such as high-altitude work permits and hot work permits) are valid (for the special operations scheduled for that day). 2. Handover from the previous shift (2–3 minutes): Briefly describe the tasks completed in the previous shift (such as fault resolution, calibration tasks) ; Highlight the reasons for unfinished tasks, the current progress, and the matters that need to be addressed by the team (e.g., “The calibration of the level gauge in Tower #5 has been suspended due to a lack of spare parts; priority should be given to securing these parts today”). 3. Daily task assignment (3–4 minutes): Clearly define tasks based on priority. Urgent tasks: Production-affecting malfunctions (e.g., failures of flow/pressure transmitters); specify the person in charge and the deadline ; Scheduled tasks: regular inspections (routes, key instruments to be checked), calibration (such as temperature sensors, valve positioners), preventive maintenance (such as tightening of wiring terminals) ; Collaborative tasks: Operations that require coordination between process and electrical teams (such as stopping meters or cutting power), with designated contacts and deadlines specified. 4. Safety and Risk Warnings (3–4 minutes) – Risks specific to the operational environment: Process risks: Protection against the properties of the substances involved (toxic, flammable, explosive) (e.g., wearing gas masks, conducting explosion tests) ; Job risks: Working at heights (safety belts, supervision), confined spaces (ventilation, gas testing), working on live electrical equipment (electricity testing, lockout/tagout) ; Environmental risks: severe weather (anti-slip, lightning protection), night operations (lighting, communication). Emphasize work permits: \"No work without a permit, no work if safeguards are not in place,\" and clarify the responsibilities of supervisors. 5. Coordination of tools and resources (1–2 minutes): Verify that the tools (calibrators, multimeters), spare parts (sensors, cables), and documents (work permits) are all available; arrange for replacements promptly if any are missing. 6. Q&A and Mobilization (1 minute) Members ask questions, team leader provides answers ; Reaffirm the core objectives, clarify the communication methods (walkie-talkie channels, emergency contacts), and disband. II. Post-shift meeting procedure for the instrumentation team (10–20 minutes): Core objectives – summarize daily work, review issues, gain experience, and improve future tasks. 1. Review of work completion (3–5 minutes): Each member reports on the tasks completed that day: Completed items: specific metrics (such as “#2 pump vibration transmitter calibrated successfully”), methods used, and results ; Uncompleted items: Reason (e.g., “process timer not stopped”, “spare parts not arrived”), next steps ; Team leaders check the task list to confirm progress. 2. Problem and anomaly analysis (4–6 minutes): Review the problems that occurred during the task: Technical issues: such as \"excessive calibration deviation of the flow meter, attributed to contamination of the sensor probe\"” ; Collaboration issues: such as “delays in coordination with the production process, resulting in task overruns”” ; Safety hazards: Such as fluctuations in gas levels in confined spaces; operations have been suspended and ventilation has been restarted” ; Collectively discuss solutions (e.g., “establish a regular cleaning schedule for probes”, “optimize the collaboration and coordination process”). 3. Sharing of experiences and lessons learned (2–3 minutes): Members share effective practices (e.g., “tips for quickly identifying stuck valves”) ; Summarize the lessons learned (e.g., “Rework occurred due to failure to check the spare part model; stricter verification of spare parts is required”). 4. Data recording and handover (2–3 minutes): Complete the records by entering calibration data, malfunction handling forms, and inspection records into the system or archiving them ; Handover to the incoming shift: unfinished tasks, instrument conditions that require attention (such as \"Fluctuations in the level gauge signal for Tank #1; marked for monitoring\"), and the status of tools and spare parts. 5. Summary and arrangements (1–2 minutes): The team leader evaluates the work done that day, praises the positive aspects, and highlights areas that need improvement ; Arrange preparations for the next day (e.g., “Apply in advance for permission to calibrate the pressure gauge of Furnace #3”). Key difference: Pre-shift meetings: “Planning in advance”, focusing on “what to do and how to do it safely”” ; Post-meeting session: “Post-event closure,” focusing on “what was done, how problems were solved, and how to improve.” Through the integration of pre-shift and post-shift meetings, it is possible to standardize and transparentize the entire workflow of operations, thereby improving the efficiency and safety of instrument maintenance.
Reply #22026-05-05
【Ten Years of Great Development in Chemical Engineering Equipment】3103-2026: Offshore Oil Engineering has mastered the welding technology for 865 MPa ultra-high strength steel. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719034 (Source: Haichuan Chemical Engineering Forum (HCBBS))
Reply #32026-05-05
【Haichuan Chemical History】Summary Post--Viewing Development Through History! Continuously being updated! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718076 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #42026-05-05
【History of Haichuan Chemical Industry】The most comprehensive illustrated guide——Jinxi Chemical Machinery Factory: The cradle of chemical machinery manufacturing in China https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719589 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52026-05-05
【Ten Years of Rapid Development in Chemical Equipment】The first in the industry from 3102 to 2026! Sinopec releases the “Fenghuo” industrial agent https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719030 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #62026-05-06
【Ten Years of Great Development in Chemical Equipment】From 3106 to 2026, the flange thickness reached 165 millimeters! Magang Limited has successfully developed the world’s thickest and heaviest hot-rolled H-beam. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719152 (Source: Haichuan Chemical Forum (Huahai Chuanliu hcbbs))
Reply #72026-05-06
[Safety Management and Standardization of Special Equipment] Compilation post! Continuously updated. Feel free to reach out! ! ! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5718553 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #82026-05-06
【Ten Years of Rapid Development in Chemical Processing Equipment】Aerospace Technology Boosts Safety in Coking! The self-developed tension monitoring system for coke oven commutators has successfully undergone 180 days of on-site application verification. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719732 (Source: Haichuan Chemical Forum (HCBBS))
Reply #92026-05-07
【Ten Years of Rapid Development in Chemical Equipment】Catalysts for converting carbon dioxide into methanol and single-tube fixed-bed reaction units for this purpose have successfully passed performance tests. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719740 (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #102026-05-07
When HR asks, “Do you have any other questions?” ”How should one answer to score points? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5719142 (Source: Haichuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.