Last edited by Vincent11 on 2018-9-18 15:10: Conversion process and operating procedures for electric furnaces, whether the investment is high, what power rating the furnace should have, 200,000 tons of sulfur for acid production
Reply #22018-09-19
Electric furnaces are generally divided into two sections: one before the next stage of conversion takes place, and the other before the final conversion occurs after exiting the absorption tower and the subsequent heat exchangers. Generally, the power of the electric furnaces in the front section is higher than that in the rear section. For 200,000 tons, it is estimated that the electric furnace will require a capacity of at least 3,000 KW.
Reply #32018-09-23
Choosing an appropriate power for the electric furnace based on the relevant design specifications results in a higher power level; for the production of sulfuric acid from 200,000 tons of sulfur, an input power of 1,000–1,200 kW is sufficient. The heating time is slightly longer, but the transformer capacity and basic electricity cost are reduced. Our sulfuric acid production plant using pyrite, with a capacity of 200,000 units: one stage with 960 kw, and four stages, each with 480 kw; it is operating normally. For your reference!
Reply #42018-09-23
The electric furnace has higher power, allowing for faster heating, as well as safer gas supply
Reply #52018-09-28
Electric furnaces have high power, allowing for rapid heating and thus reducing the startup time

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.