What are the matters that require company-level confirmation for the construction completion acceptance of the alkylation and spent acid treatment plant? Such as fire protection facility inspection? Are there any other important matters?
Simultaneous implementation of safety measures; Simultaneous implementation of environmental protection measures ; The three simultaneities of occupational health.
It is necessary to keep track of specific items such as the installation of internal tower components and the acceptance of compressor installation, which require inspection by the company’s equipment staff
Go through the procedures,? ? Has the environmental impact assessment been completed? ? Is it still about the coordination among the construction party, the designers, and the equipment manufacturers during the construction period? ?
Where is the alkylation in the original post? ? Dufa or Lufa? ? Is there an adequate source of raw materials? ? Alkylation isn’t doing well these days; it doesn’t generate any profits. . . .
Refer to the installation inspection and evaluation form prepared by the supervision engineer in accordance with GB, and have the engineers from the Equipment Management Department verify it once again.
Alkylation isn’t profitable; how about isomerization units? Are they profitable?
The market conditions aren’t very good. . . Crude oil has also become more expensive recently. Refining is also not as good as it was last year or the year before. . . Alkylation, isomerization, and oil modifiers such as MTBE are also affected. . . Last year, the deep processing of liquefied gas via non-oil-based routes was very promising. . .
The technical challenges associated with acid regeneration itself also present significant obstacles; if not resolved, these will affect the development prospects of alkylation.