Vertical oil-free vacuum unit

2019-10-19View Original

Thread Content

For the recovery of organic materials, rotary vertical vacuum units are used; a cold trap is installed before the gas enters the equipment. After just one month of operation, the required vacuum level is not achieved, the interior of the chamber often gets clogged, and the motor trips. . . Could the seniors give some advice?
Reply #22019-10-19
Isn’t it a front-end issue? The area of the distillation condenser is insufficient / the exhaust gas is not clean enough
Reply #32019-10-19
The problem lies at the front; the gas and liquid have not been fully separated.
Reply #42019-10-20
Use a screw vacuum pump, and the problem is solved!
Reply #52019-10-22
Even after replacing the screw vacuum pump, it’s still very troublesome to disassemble and assemble it. I want to add a filter at the air intake. Filters are also installed between the pumps; I’m not sure if that will solve the problem.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.