HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

What are the regulations regarding the deflection under overload testing for bridge cranes?

2022-05-13View Original

Thread Content

Question: For a bridge crane with a span of 22.5 meters and a rated lifting capacity of 50 tons, what is the maximum allowable deflection during overload testing in millimeters to be considered acceptable? Which regulations contain the provisions on this matter?
Reply #22022-05-13
This post was last edited by Shutong on 2022-5-13 21:39. Please refer to GBT 14405-2011 General Bridge Cranes, 5.3.9

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.