HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Simple suspension basket at the construction site

2019-05-28View Original

Thread Content

After the equipment is in place at the construction site, the hooks and ropes must be removed; moreover, a construction and safety plan needs to be developed for the temporary suspension basket that has been constructed. Are there any special requirements? The GB/T19155--2017 standard does not specify the requirements for such lifting cages, but these types of lifting devices are often used at many construction sites. I would appreciate it if experts could provide some guidance!
Reply #22019-05-28
Is it the construction plan for installing and removing the suspension basket? Should we still go with the plan to remove the hook and get the rope?
Reply #32019-05-28
It is a hook-and-rope lifting cage that also doesn’t require installation or disassembly

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.