HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Issues regarding the installation of settlement observation points in desulfurization absorption towers

2022-01-06View Original

Thread Content

The last edit to this post was made by zhufeiqq on 2022-1-6 at 12:32. According to the DL/T 5418-2009 Standards for Construction and Acceptance of Flue Gas Desulfurization Absorption Towers in Thermal Power Plants, the settlement observation points for the foundation are located as follows: they are set on the tower wall, and the foundation itself also has settlement observation points. Do these two sets of observation points overlap?
Reply #22022-01-07
The standard refers to foundation settlement. Although it is installed on the tower wall, according to standards, there are many different types of towers, and a tower cannot represent the equipment foundation.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.