Thread Content
The 50,000-ton per year production capacity for porous nitric acid project of Xinjiang Jinxiang Sairuidie Chemical Technology Co., Ltd. was fully completed in terms of construction. Author/Source: Chuan Jinxiang Date: 2020-09-23 Clicks: 47 On September 21, the construction of the 50,000-ton per year production capacity for porous nitric acid project of Xinjiang Jinxiang Sairuidie Chemical Technology Co., Ltd. was fully completed on September 20. This project is an important part of the expansion of New Jinxiang’s industrial chain for the \"100,000 tons per year of cyanuric acid production along with 600,000 tons per year of nitro-based compound fertilizers\" project, and it plays a key role in optimizing the product structure of Xinjiang Jinxiang. The project officially commenced its engineering design on September 5, 2019, with physical construction starting on October 1, 2019. During the construction phase, it faced severe challenges such as insufficient funding and the repeated outbreaks of the COVID-19 pandemic. Under the strong leadership and meticulous planning of the group company, Xinjiang Quanxiang Management National Team resolutely implemented the decisions and arrangements set by the head office. Unfazed by difficulties, they faced challenges head-on, calling on all project workers to unite as one and go all out to \"fight against high temperatures, severe cold, and the pandemic.\" With high morale and great enthusiasm, they worked day and night at the construction sites, resolving various abnormal situations that arose on multiple occasions. After more than 300 days of nightly efforts, the desired goal was finally achieved.