【Common Issues in Haichuan Pipeline Design】--Nitrogen Setting Requirements

2025-10-18View Original

Thread Content

Nitrogen setting requirements: 1. \"Design Code for Automated Systems in Petrochemical Tank Farms\" SH/T 3184-2017, 4.2.2.8 – A pressure gauge should be installed on the nitrogen inlet pipeline of the nitrogen seal valve. II. \"Code for Design of Tank Areas in Petrochemical Storage and Transportation Systems\" (SH/T 3007-2014): 3.5 For combustible liquid storage tanks protected by nitrogen sealing, the operating pressure should be in the range of 0.2 kPa to 0.5 kPa; for other tanks equipped with breather valves, the operating pressure should be in the range of 1 Pa to 1.5 kPa. III. \"Fire Protection Design Code for Petrochemical Enterprises (2018 Edition)\" (GB 50160-2008): 7.2.7 When utility pipelines are connected to pipelines or equipment that carry combustible gases, liquefied hydrocarbons, or combustible liquids, the following requirements must be met: 1. Check valves should be installed on utility pipelines that are used continuously, along with isolation valves at their bases ; 2. Check valves and one isolation valve, or two isolation valves, should be installed on utility pipes that are used intermittently, with a inspection valve placed between the two isolation valves ; 3. Utility pipes used only when the equipment is shut down should be equipped with blind flanges or disconnected. IV. Code for Design of Layout of Metal Piping in Petrochemical Industries, SH/T3012-2011: 9.4.1 When semi-fixed purging nitrogen is required in the plant, nitrogen connections shall be provided at the hose station, along with double valves.
Reply #22025-10-18
【Common Issues in Haichuan Pipeline Design】--The often-overlooked requirements for setting safety valve drain holes https://bbs.hcbbs.com/thread-5703311-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #32025-10-18
【Common Issues in Haichuan Pipeline Design】--The Placement of Vent and Drain Ports in Pipeline Design https://bbs.hcbbs.com/thread-5703312-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #42025-10-18
【Common Issues in Haichuan Pipeline Design】--Which media require closed-loop sampling https://bbs.hcbbs.com/thread-5703314-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #52025-10-19
【Ten Years of Rapid Development in Chemical Equipment】2743-2025: Industrialization breakthrough of furan hydrogenation refining catalysts at Hyosung Chemical, by China National Research Institute of Chemistry https://bbs.hcbbs.com/thread-5703034-1-1.html (Source: Haichuan Chemical Forum)
Reply #62025-10-19
【Ten Years of Rapid Development in Chemical Equipment】By 2025, the domestic production rate for such equipment will exceed 98%; the first phase of the coal-to-natural gas project in the Northeast region has been completed in its entirety. https://bbs.hcbbs.com/thread-5703054-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #72025-10-20
【Ten Years of Rapid Development in Chemical Equipment】Successful Industrial Application of Hydrolysis-Resistant PBT Catalyst Developed by Sinopec Shanghai Research Institute from 2025 to 2035 https://bbs.hcbbs.com/thread-5703070-1-1.html (Source: Haichuan Chemical Forum)
Reply #82025-10-20
【Ten Years of Rapid Development in Chemical Engineering Equipment】2748-2025: Bohai Equipment Achieves Domestic Production of Key Components for High-Power Flue Gas Turbines https://bbs.hcbbs.com/thread-5703099-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #92025-10-21
【Ten Years of Rapid Development in Chemical Equipment】2749–2025: China’s largest-scale cracking gas valves in the world – The 60-inch ultra-large diameter cracking gas valves used at Tianjin Nangang Ethylene Plant have passed industrial application tests. https://bbs.hcbbs.com/thread-5703102-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #102025-10-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】Sinopec’s independently developed intelligent assistance system for evaluating defects in pipe circumferential weld X-ray inspections, 2754–2025, has completed accuracy tests. https://bbs.hcbbs.com/thread-5703159-1-1.html (Source: Haichuan Chemical Industry Forum)
Reply #112025-10-23
【Ten Years of Rapid Development in Chemical Engineering Equipment】The intelligent pipeline inspection model for petroleum and petrochemical pipelines in China, developed between 2025 and 2755, has been successfully created and put into use: https://bbs.hcbbs.com/thread-5703160-1-1.html (Source: Haichuan Chemical Industry Forum)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.