I have a question: if work is accelerated on an environmental protection project, should the construction, the equipment foundations, or the water tanks be done first? ?

2017-06-01View Original

Thread Content

I have a question: if work is accelerated on an environmental protection project, should the construction, the equipment foundations, or the water tanks be done first? ? The outer tube again? ? ? What are the reasonable steps for equipment installation and similar tasks? ?
Reply #22017-06-01
Which specific components are included in the project, and how advanced are the construction drawings? If rushing the work, start with those tasks that have a long construction period. For projects with a short construction period, work can be carried out in between. Ensure timely supply of materials during this period. Handle the relevant procedures simultaneously to avoid affecting the acceptance.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.