HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The upper installation in the tank area was modified to a lower installation

2017-10-27View Original

Thread Content

Now, it is required that the loading ports on industrial tank areas be changed to discharge ports, and automatic interlock devices must be added for unloading. Are there any installations that have already been completed? Can I upload a picture to take a look? What instruments or systems need to be added for the renovation?
Reply #22017-10-27
Could you explain this in detail? I don’t quite understand the meaning
Reply #32017-10-27
1. In the past, when loading in tank areas, some used upper loading ports (the loading port was located at the top of the tank vehicle, with the piping used for loading on a secondary platform), while others used lower loading ports (the loading port was at the bottom of the tank vehicle, with the piping for loading on the ground). Now, lower loading ports are required, so modifications are necessary. 2. In the past, the unloading of gasoline and diesel was done manually, without any shut-off valves or SIS systems; since the accident at Linyi Jinyu, modifications have become required. I just want to check if there are any that have already been renovated, so I can use them as a reference.
Reply #42017-10-27
It’s actually just a batch controller. Each loading arm is controlled by a PLC. Interlocks for oil level, grounding, flow rate, etc. Enter the amount to be pumped on the control panel; once confirmed, the pump will start and the valves will open. The amount pumped is calculated based on the flow meter, and once the desired loading amount is reached, the valves will automatically close and the pumping pump will stop. You can consult the manufacturer of the batch controller for this. Our company uses batch control instruments from Shanghai Yino and Nanjing Jiumao.
Reply #52017-10-27
For the lower part, wouldn’t that mean adding a pressure-stabilizing pipeline to the tank truck, connecting it directly to the storage tank? Or should I just open the lid on top of the tank truck? Not very clear. . . Wait and learn*~
Reply #62017-10-27
Take a look at others' opinions and learn from them.
Reply #72017-10-27
I have a question: it’s just a renovation of the oil storage area, right? There’s no requirement for a chemical product storage area, is that correct?
Reply #82017-10-28
It can be achieved by adding a conversion adapter; I’ve modified it
Reply #92017-10-28
The requirements vary from region to region; those who need it can add me on QQ at 644604847

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.