HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

For DCS renovation, what completion documents are required from the DCS manufacturer? Those who know please leave a message

2020-10-14View Original

Thread Content

As part of the project renovation, some additional DCS cabinets, cards, control panels, etc. have been added. The renovation is now complete. May I ask what completion documents the DCS manufacturer needs to provide to us, the owners? Thank you
Reply #22020-10-15
Software design, hardware design, FAT and SAT acceptance reports, detailed configuration lists (software and licenses, hardware), power distribution instructions, IO point allocation, cabinet configuration details, CAD design drawings, and cross-wiring specifications, among other documents.
Reply #32020-10-15
Pay attention to the licenses, including WINDOWS licenses and industrial software licenses, as well as the stamped completion documents (including wiring diagrams, hardware configuration details, etc.)

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.