HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Turnaround time

2025-03-09View Original

Thread Content

For a 5.5-meter ramming coke oven with a carbonization chamber dimension of 15980×554×5500, what is the appropriate standard temperature when the cycle time is 65 hours?
Reply #22025-03-09
For 5.5-meter ramming coke ovens, when the cycle time is 65 hours, the standard temperature is usually set between 1050°C and 1100°C. This helps to ensure the quality and output of coke. .
Reply #32025-03-25
Ensure that the temperature of the burner remains at least 1000 degrees; the standard temperature is around 1160 degrees or higher. The final value is determined based on the difference between the burner’s temperature and this standard temperature.
Reply #42025-04-18
To maintain the temperature of the furnace nozzle on the machine side and to protect the furnace walls, once the coking time exceeds 28 hours, the standard temperature must not be lower than 1220°C; it can be set at 1240°C℃

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.