The overall commissioning of Unit 1 of the Datang Fuxin coal-to-natural gas air separation plant was successful on the first attempt

2019-08-20View Original

Thread Content

The overall commissioning of Unit 1 of the Datang Fuxin coal-to-natural gas air separation plant was completed successfully in just one attempt. Author/Source: Yaha Coal Chemical Industry. Date: 2019-08-20. Clicks: 5. By 9:05 on August 19, the overall commissioning of Unit 1 of the air separation plant was finished successfully, two days ahead of the scheduled date for the second-phase testing. The main tasks of the commissioning of Unit 1 include: static protection tests for the compressor unit, individual testing of the turbine, and trial operation of the air compression unit + turbine + gearbox + air booster. One of the more important steps is the individual testing of the turbine. To ensure the successful completion of this testing and to gain time for the overall commissioning of the unit, the air separation plant organized the step-by-step execution of the startup procedures on site; tasks such as the operation and static testing of the oil system, the warming up of high- and medium-pressure steam pipes, the establishment of the vacuum system, and the setup of the condensate water system were carried out successively. At 21:20 on August 17, with the rapid shutdown valve of the Series II turbine opening, the individual trial operation of the air separation unit’s turbine officially commenced. At 21:25, the turbine speed increased to 800 rpm, and 1 control room emergency shutdown test as well as 2 on-site emergency shutdown interlock tests were carried out. The quick-shut valve was reopened, and the turbine was started to operate at 800 rpm for 60 minutes. At 22:55, the unit’s speed increased rapidly, passing through the surge zone to reach 3463 rpm, after which it operated stably for another 200 minutes ; Operate at the rated speed for 60 minutes. At 1:20 on the 18th, the Series 1 turbine was started. The overspeed test of the turbine was completed at 5:30 on the 18th. After successful single-unit testing, the subsequent testing steps are carried out in an orderly manner. During the unit commissioning, the company’s leadership paid close attention to the matter, visiting the air separation site on several occasions to check the progress of the commissioning preparations as well as the operation of the turbine. The management team of the gasification center organized everything carefully in terms of safety, quality, schedule, and personnel; the team operators remained at their posts and cooperated actively to complete all tasks. The entire commissioning process was carried out in an orderly manner, laying a solid foundation for the successful first attempt at unit commissioning. The successful commissioning of Unit 1 has boosted employees’ confidence in commissioning tasks and lifted their morale, laying a solid foundation for the successful commissioning of the air separation system as well as its subsequent operation under load!
Reply #22019-08-21
How many years has the construction of coal-to-natural gas projects in Fuxin taken? Will gas supply be available this winter?
Reply #32019-08-22
Is current coal-to-natural gas production not able to reach a profit point? Strategic and livelihood projects?
Reply #42019-08-22
For a company like Datang, which has plenty of money and is not constrained by financial limits, engaging in coal chemical production is merely a casual activity – there’s no focus on profitability, let alone any consideration for strategy or the well-being of the public.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.