Thread Content
**The new unit added as part of the technical upgrade project for Ningxia Coal Group’s 4 million tons per year coal-to-oil production facility was successfully commissioned. Author/Source: Sinochem Third Construction; Date: 2019-09-03; Clicks: 108. The 296-wax filtration unit, which was part of this technical upgrade project carried out by the Ningxia branch, was also successfully commissioned recently. **The B package of the maintenance and improvement projects for the Ningmei coal-to-oil project in the energy sector includes the 396 wax filtration unit, the substation cabinet areas, as well as other improvement projects. These fall under the category of technical upgrades in chemical production facilities. There are numerous construction sites, a large coverage area, and high levels of complexity; operations and production take place simultaneously. There are also many safety hazards related to flammability, explosiveness, high temperatures, and high pressures, and the working environment poses new challenges to on-site safety management. At present, the branch office is actively cooperating with the owner to carry out commissioning work prior to the start of operations of the plant, thereby laying a solid foundation for its successful trial operation and the undertaking of subsequent projects.
There is a lot of coal gangue in the northeast, but no power plants use it as fuel. Does the moderator know why?