Thread Content
Sanning Chemical’s Ethylene Glycol Boiler No. 1 Successfully Ignited – Author/Source: Sanning Chemical; Date: 2020-07-06; Clicks: 98. At 12:08 on July 3, upon the command \"Ignite\" given by You Huabin, the overall supervisor for the operation of the ethylene glycol boiler, Zhou Jian, the chief operator on site, pressed the automatic ignition button. A red flame appeared on the LCD screen in the control room, signaling that the first ignition attempt of Boiler No. 1 in the plant’s power station was successful, and the boiler had entered the stage of heating at medium to high temperatures. It is understood that the ethylene glycol power station project commenced construction on October 8, 2018; on December 25, 2019, the accompanying demineralized water station was able to produce qualified demineralized water, and low-temperature drying of Boiler No. 1 was successfully completed. After nearly two years of construction work, the construction and installation of the boiler area in the project have been initially completed, meeting the conditions for starting up trial production. Boiler No. 1 was successfully ignited, marking the beginning of the trial production of the ethylene glycol plant. This provided a solid foundation for the subsequent purging of the pipelines in the entire system, and it also laid a good basis for the timely commissioning of all the units in the plant.