Thread Content
Chengda Company – Tender Announcement for Carbon Steel Pipe Fittings for the 100,000-ton BDO Project in Phase 3 of Xinjiang Lanshan Tunhe Energy Co., Ltd. Author/Source: Date: 2022-06-21 Clicks: 3 1. Tendering Conditions: Chengda Engineering Corporation of China. For the 100,000-ton BDO project in Phase 3 of Xinjiang Lanshan Tunhe Energy Co., Ltd., the funding required for its construction has been secured; thus, the conditions for tendering the carbon steel pipe fittings needed for this project are met*. The tenderer is China Chengda Engineering Co., Ltd., and a public tender is now being conducted. 2. Project Overview and Bidding Details 2.1 Project Overview and Bidding Details (1). Lot/Package Number: E22002-B-INQ-80-014/01 Lot/Package Name: Chengda Company – Xinjiang Lanshan Tunhe Energy Co., Ltd.’s Phase 3 100,000-ton BDO Project – Carbon Steel Pipe Fittings – Lot 01 Bidding Content and Scope: As specified in the bidding documents. 2.2 Delivery Time: Bidder shall provide the fastest possible delivery time. 2.3 Delivery Location: Lama Huliang Industrial Park, Qitai County, Changji Prefecture, Xinjiang – Chengda Lanshan Tunhe Phase 3 Project Site. 2.4 Quality Standards or Key Technical Specifications for the Goods: As specified in the bidding documents. 2.5 Other: 2.5.1 Both domestic and imported materials shall be quoted on a DDP basis, including taxes, necessary spare parts, and specialized tools. 2.5.2 Two-year spare parts are offered as an optional item and are not included in the total price. 3. Qualification requirements for bidders 3.1 Qualification requirements for bidders 3.1.1 The bidder must be an independent legal entity under the People’s Republic of China, possess a valid business license, have a registered capital of 3 million yuan or more, have been in operation for at least 3 years, and be eligible to be a general VAT taxpayer. 3.1.2 Bidders must *register. 3.1.3 Manufacturers on the list of qualified suppliers for this project. 3.1.4 In principle, only manufacturers are allowed to submit bids for this procurement package. If a manufacturer can only bid through an agent, it must provide a document confirming its exclusive authorization to do so. 3.1.5 Meet the qualification requirements related to the project. 3.1.6 It possesses good banking credit and commercial reputation, has not been ordered to suspend operations, has no assets seized or frozen, and is not in a state of bankruptcy; it also has no property disputes. 3.2 The bidder shall not be in any of the following situations: (1) Having the same person as the person in charge of another bidder for this project. (2) There is a direct controlling relationship with other bidders for this project. (3) Having a management relationship with other bidders for this project. (4) There have been the following serious adverse circumstances in business operations over the past three years: ① Being suspended, disqualified from bidding, or prohibited from participating in tendering activities by the industry regulatory authorities at the provincial level or above where this project is located, in accordance with the law. ②Currently in a state where it has been ordered to cease production and business operations; have its licenses suspended or revoked; have its permits suspended or revoked; or have its qualification certificates revoked. ③Entering liquidation proceedings, being declared bankrupt, or encountering other circumstances that result in an inability to fulfill obligations. ④In accordance with the company’s requirements for managing bidders, those who are prohibited from participating in bidding activities and whose prohibition is still in effect. 3.3 Whether the project accepts consortia: Accept / Reject. The parties involved in a consortium shall, in accordance with their division of responsibilities as stipulated in the agreement, meet the corresponding conditions and requirements set out in paragraph 3.1 of this article ; None of the parties to the consortium shall be in the circumstances specified in paragraph 3.2 of this article ; None of the parties in the consortium shall submit a bid on its own behalf, nor shall it participate in the bidding process for this project as part of another consortium. Otherwise, all relevant bidding documents will be invalid. 4. Registration, Login (Please log in) 5. Tender Submission: Is tender submission required? No Yes 5.1 Submission period: From 2022-06-21 09:00 to 2022-06-25 16:00 (Beijing time) * 6. Acquisition of tender documents 6.1 Acquisition period: From 2022-06-22 09:00 to 2022-06-28 16:00 (Beijing time)