Thread Content
Wuhuan Company – Announcement regarding the Carbon Steel Pipeline Project for the Energy-Saving Renovation of the Urea Production Facility at Chongqing Jianfeng Chemical Co., Ltd. Author/Source: Date: 2022-12-08 Clicks: 41 1. Bidding Conditions: The funds required for the energy-saving renovation of the urea production facility at Chongqing Jianfeng Chemical Co., Ltd., carried out by China Wuhuan Engineering Co., Ltd., have been secured. The carbon steel pipelines needed for this project meet the requirements for bidding (Bidding Number: 22181-MCM0300-PP). The tenderer is China Wuhuan Engineering Co., Ltd., and a public tender is now being conducted. 2. Project Overview and Bidding Details 2.1 Project Overview and Bidding Details (1). Lot/Package Number: 22181-MCM0300-PP/01 Lot/Package Name: Wuhuan Company – Chongqing Jianfeng Chemical Co., Ltd.’s Second Urea Production Plant Energy-Saving Transformation Project – Carbon Steel Pipes – Lot 01 Bidding Content and Scope: A batch of carbon steel pipes 2.2 Delivery Period: 1 month after the contract is signed 2.3 Delivery Location: The location specified at the project site 2.4 Quality Standards or Key Technical Specifications for the Goods: Detailed list and specifications are provided in the attachment to the bidding documents: Technical Specification Sheet. 2.5 Other: None 3. Qualification requirements for bidders 3.1 Qualification requirements for bidders 1. Sinochem Group’s \"List of Qualified Suppliers at the Group Level for Public Bidding Projects for the 2021–2022 Period.\" 2. Qualified supplier for the general contract of the energy-saving renovation project for urea production at Chongqing Jianfeng No. 2 Chemical Plant. 3. Suppliers listed in the \"Procurement Subcontracting Table\" for the approved projects. 3.2 Bidders shall not fall under any of the following circumstances: (1) Being the same person as the person in charge of another bidder for this project. (2) There is a direct controlling relationship with other bidders for this project. (3) Having a management relationship with other bidders for this project. (4) There have been the following serious adverse circumstances in business operations over the past three years: ① Being suspended, disqualified from bidding, or prohibited from participating in tendering activities by the industry regulatory authorities at or above the provincial level where this project is located, in accordance with the law. ②It is in a state where it has been ordered to suspend operations, have its license temporarily seized or revoked, its permits temporarily seized or revoked, or its qualification certificates revoked. ③Entering liquidation proceedings, being declared bankrupt, or encountering other circumstances that result in an inability to fulfill obligations. ④In accordance with the company’s requirements for bidder management, those who are prohibited from participating in bidding activities and whose prohibition is still in effect. 3.3 Whether the project accepts consortia: Yes/No. The parties involved in a consortium shall, in accordance with their division of responsibilities as stipulated in the agreement, meet the corresponding conditions and requirements set out in paragraph 3.1 of this article ; None of the parties to the consortium shall be in the situation specified in paragraph 3.2 of this article ; None of the parties in the consortium shall submit a bid on its own behalf, nor shall it participate in the bidding process for this project as part of another consortium. Otherwise, all relevant tender documents shall be invalid. 4. *Registration period: From 09:00 on December 7, 2022, to 16:00 on December 13, 2022 (Beijing time)