HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Qingyang’s new coal chemical project starts

2026-06-23View Original

Thread Content

This post was last edited by zdy551900 on 2026-6-23 14:18 Qingyang New Coal Chemical Project Launch Excerpted from - Professional Talent Micro Recruitment Recently, on June 23, 2026, China Tianchen Engineering Co., Ltd. won the bid for the preparation of the feasibility study report of the Qingyang Green Coal-based Integration-Coal-to-Olefins Demonstration Project of Gansu Energy and Chemical Group. Gansu Nenghua Group's Qingyang green coal-based integration-coal-to-olefins demonstration project relies on Gansu Nenghua Investment Group's own coal mines in the Qingyang area to build a 2 million tons/year coal-to-olefins project. Tianchen Engineering is responsible for completing the project, including the content of the feasibility study report, the feasibility study report attachments, the feasibility study report drawings and other content report preparation and follow-up supporting services, and passed the project technical review, and was finally approved by the competent authority. The Qingyang Clean and Efficient Coal Utilization Integrated Project is a provincial key project in Gansu Province. It is undertaken by Gansu Nenghua Co., Ltd., which is controlled by the Gansu Provincial State-owned Assets Supervision and Administration Commission. The total investment is 60.7 billion yuan. It is located in Changqingqiao Chemical Industrial Park in Qingyang. It is a key implementation project of Gansu Nenghua Group's strategy of "coal-based, multi-energy complementation, chain extension and strengthening, and green development", helping the region to build a diversified energy industry system. On October 18, 2025, an expert demonstration meeting on the "Gansu Nenghua Group Qingyang Integrated Clean and Efficient Coal Utilization Project Plan" was held in Qingyang. This project is promoted by Gansu Province * * The core carrier of the construction of the Longdong Comprehensive Energy and Chemical Base, relying on the rich coal resource endowment of Qingyang City - the three major coal mines of Gansu Nenghua Group, which the core of the project relies on, are all located in Ning County, Qingyang City, among which the Jiulongchuan Coal Mine has a planned production capacity of 8 million tons/year and supporting 2×660MW coal power projects. The planned production capacity of Zaosheng and Chunrong coal mines is 6 million tons/year. The total planned production capacity of the three major coal mines reaches 20 million tons/year, providing stable raw material support for the project. The project will integrate other high-quality coal resources in the Qingyang area, focus on the two core industrial chains of coal-based olefins and coal-to-natural gas, and focus on the clean and efficient utilization of coal. The core products can cover basic chemical raw materials and clean energy fields. Gansu Nenghua Group has promoted the construction and preliminary work of three major coal mines and supporting facilities with a total investment of 46.7 billion yuan, providing solid resources, funds and infrastructure support for the implementation of coal-based integrated demonstration projects, and realizing the coordinated layout of the "coal-electricity-chemical" industrial chain.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.