HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Construction of new hydrogenation units, water injection adjustment for high-pressure heat exchangers

2026-03-22View Original

Thread Content

In the newly installed hydrogenation units within the company, water was originally injected at the high-pressure heat exchanger E103 as part of the original design, in order to cool the reaction products. However, after operations started, excessive temperatures were observed in that area, which required the injection point to be moved to a location with higher temperatures. Yet currently, there is no injection point available at heat exchanger E102, which is where the higher temperatures occur. It is the end drain for DN20. Can the water injection point be connected to this drain point in order to carry out water injection?
Reply #22026-03-23
No, the water injection points are specifically designed with a special structure; using a drain line for water injection would create a serious hazard. Never do this, or you will only be causing trouble for yourself

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.