HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Flexible hose selection

2017-11-30View Original

Thread Content

For an EPC project involving storage and transportation facilities for substance B, submersible dip pipes were used for design, procurement, and construction purposes for the loading and unloading operations. Regarding the three inspections and four regular checks, one of the owners’ supervisors said that he recently visited a chemical plant where the elbow pipes there were extremely complex, and suggested that we buy new ones in that style. How should we respond? The documents provided by the owner, such as the process package, safety pre-assessment, and occupational health pre-assessment, never mention any relevant technical requirements.
Reply #22017-11-30
Taking everything into consideration, as long as there are no safety hazards and it does not violate any principles, we will follow the owner’s requests.
Reply #32017-11-30
I am a professional manufacturer of flexible hoses. If you need such hoses for your project, you can send me the technical requirements so that I can check whether we can meet them. My email address is 228449263@qq.com
Reply #42017-11-30
This post was last edited by Clouds of flowing water shine on 2017-11-30 22:29. For EPC projects, where does the MONEY come from? How to explain this to the boss?
Reply #52017-11-30
If there’s no problem with yours, then why not change it? Are there any obvious shortcomings in the one you chose?
Reply #62017-11-30
This post was last edited by Clouds of flowing water shine on 2017-11-30 21:14; it has an unpleasant vibe. However, there were no specific requirements in the owner’s relevant documents, so we overlooked it.
Reply #72017-12-01
Since it’s uncomfortable, it’s better to choose the right one
Reply #82018-06-09
A flexible hose mainly consists of a gas-phase tube and a liquid-phase tube. What the supervisor referred to as complex must be a flexible hose with a gas-phase tube; if you have a gas-phase recovery system, then you definitely need a flexible hose with a gas-phase tube! For inquiries regarding flexible hoses, please contact 18705139803!

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.