HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Why has the newly installed packing in the ammonia vaporization tower become broken into pieces?

2019-04-09View Original

Thread Content

Why has the newly installed packing in the ammonia vaporization tower become broken into pieces? Urgent
Reply #22019-04-09
It’s either a material issue or a quality issue.
Reply #32019-04-09
What material is generally used inside?
Reply #42019-04-09
Are there any pictures? Send it up for everyone to analyze!
Reply #52019-04-09
I agree with the view from the third floor: it’s either a problem with the material of the filler or an issue related to the quality of its processing. Check the design requirements to determine what type of filler should be used, and see if the filler currently in use meets those requirements. Also find out which manufacturer produces the current filler – whether it’s a supplier with whom we are working for the first time or a long-time partner – and that will help identify the cause of the problem
Reply #62019-04-11
Is it ammonia vaporization in the steel plant? Check the properties of the raw material to see if it contains CL ions

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.