The 4,000-ton class crawler cranes were used for the first time in the 40 million tons per year integrated refining and chemical processing project of Zhejiang Petrochemical. Crawler Crane Resource Sharing Platform, 0927, 17:57. The No. 1 unit of the first phase of Zhejiang Petrochemical Co., Ltd.’s 40 million tons per year integrated refining and chemical processing project – the 380 million tons per year continuous reforming unit – features “three-in-one” and “two-in-one” reforming reactors. With a height of 96 meters and a weight of 613 tons each, these are China’s largest reforming reactors to date. At Zhejiang Petrochemical’s 40 million tons per year integrated refining and chemical processing project in Zhoushan, the lifting of the reforming triple-reactor was completed as part of the lifting integration contract awarded to Sinopec Transportation Company; this marked the first construction task carried out by that company after taking over such a large-scale piece of equipment. This set of reforming reactors consists of reduction sections/reforming reactors 1, 2, and 3, namely 2 \"three-in-one\" reactors, and buffer zones/reforming reactors 4 and 5, namely 2 \"two-in-one\" reactors. The \"three-in-one\" reactors are as tall as 96 meters and weigh 613 tons each; they represent China’s largest reforming reactors to date, setting a new record for Lansi’s reactor manufacturing and marking a milestone in this field.
Even heavy equipment is a piece of cake for a giant crane: lol
Is this long, slender device the reforming reactor? If it weren’t specified, I would definitely think it’s a distillation tower
A reforming reactor, seeing one for the first time.
A high lifting position is a challenge.
The skirt base is in the middle and needs to be placed inside the frame; since it’s a concrete frame and there are large cranes available, none of these pose any problems
It might be due to the larger scale and different installation method; the skirt base has been moved to the middle