Thread Content
On March 25, the website of the Fuzhou Municipal People’s Government published a notice issued by the Fuzhou Ecology and Environment Bureau regarding the decisions made on March 16–22, 2026, with regard to the approval of environmental impact assessment documents for construction projects. In accordance with the relevant provisions of the approval procedures for environmental impact assessments of construction projects, after examination, our department issued an approval decision regarding the environmental impact assessment documents for 1 construction project from March 16, 2026, to March 22, 2026. The approval decision made is hereby announced, with the announcement period running from March 23, 2026, to March 29, 2026 (7 days). The hydrogen peroxide production project of Fujian Shenyuan New Materials Co., Ltd. is located within the boundaries of the existing factory site of Fujian Shenyuan New Materials Co., Ltd. at No. 1 Songqi Avenue, Kemen Industrial Park, Lianjiang County, Fuzhou City. The project involves the construction of a hydrogen peroxide production facility with an annual capacity of 275,000 tons (on a percentage basis), along with the necessary supporting infrastructure; once completed, it will add an additional annual production capacity of 275,000 tons of hydrogen peroxide. According to the evaluation conclusions in the \"Report\" and the technical assessment report issued by Fuzhou Environmental Impact Assessment Technology Center (report number 2-2026-004), the construction of this project is in line with **industrial policies, meets the requirements for ecological and environmental zoning management in Fuzhou, and its location complies with plans such as the \"Overall Plan for the Expansion of Fuzhou Taiwanese Investment Zone (2012–2020)\\", the \"Fuzhou Chemical Industry Development Plan (2025–2030)\\", and the \"Revised Overall Plan for the Chemical New Materials Industrial Park in Fuzhou Kemeng Port Economic Zone (2024–2035)\\", as well as the requirements set out in the environmental impact assessments associated with these plans. On the premise of strictly implementing the environmental protection \"three simultaneities\" system, earnestly fulfilling the various requirements for ecological and environmental protection as well as environmental risk prevention outlined in the \"Report\", and strengthening environmental management, the project is feasible from an environmental impact perspective. Our bureau in principle agrees to the nature, scale, location, technology of the construction projects listed in the Report, as well as the environmental protection measures to be taken.
【Ten Years of Rapid Development in Chemical Engineering Equipment】Key dehydrogenation technology for the toluene-methylcyclohexane organic liquid hydrogen storage system was approved for use, 3051–2026 https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716272 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first subcritical once-reheat power unit was successfully connected to the grid for power generation between 2030 and 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716102 (Source: Haichuan Chemical Engineering Forum (HCBBS))
【HaiChuan Safety Discussion】Hidden Dangers Around Us -- Album of Safety Hazards at Instrumentation and Electrical Interfaces https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716450 (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】Successful pilot testing of Dongfang Electric’s natural gas-ammonia combustion technology from 2032 to 2026! https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716290 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5705828 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3053–2026: China’s first 100-kilometer-long carbon dioxide transmission pipeline – the million-ton-class CCUS carbon dioxide pipeline in the Shengli Oilfield has been operating steadily for 1,000 days. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716490 (Source: Haichuan Chemical Industry Forum (HCBBS))
Which party is responsible for designing the equipment lifting lugs: the design unit, the manufacturing unit, or the construction unit? https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716586 (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first research project on industrial seawater hydrogen production has successfully achieved 1,000 hours of stable operation from 2016 to 2026. https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716642 (Source: Haichuan Chemical Industry Forum (HCBBS))
【Haichuan Chemical Technology Documentation】Case of leakage in fresh water transmission using 316L stainless steel pipes https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716662 (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】3057–2026: International Leadership in Organic Tubular Microporous Membrane and Related Equipment Technologies https://bbs.hcbbs.com/forum.php?mod=viewthread&tid=5716683 (Source: Haichuan Chemical Industry Forum (HCBBS))