[Haichuan Overseas Engineering] The frame structure of the low-pressure elevated flare system for the Amira public works project in Saudi Arabia was completed 15 days ahead of schedule

2025-12-02View Original

Thread Content

On November 25th, local time, with the final steel structural frame module accurately hoisted into place, the low-pressure elevated flare frame structure for the Amira public works project, which is under the construction responsibility of Huanqiu Jilin Chemical Construction in Saudi Arabia, was successfully completed 15 days ahead of schedule. This achievement laid a solid foundation for the smooth installation of the flare pipes that follow. It is reported that the low-pressure overhead flare for this project has a height of 175 meters and a total weight of around 650 tons. Modular installation methods are used in its construction, with the entire structure being divided into 7 sections for assembly and lifting. As the tallest iconic structure at the project site, this torch is also the second-tallest low-pressure elevated torch in Asia at present; its installation precision and construction complexity have attracted considerable attention from all parties. To ensure the smooth progress of the torch frame lifting and alignment work, project team members took charge of directing the operations, led the equipment management team, and worked together with the local Saudi company AL JABER Heavy Lifting to develop lifting plans and coordinated working methods. The team developed a detailed plan focusing on the lifting sequence, the movement routes of the machinery, and the construction process, ultimately creating a comprehensive control scheme for the entire workflow. During on-site construction, the workers strictly adhere to the QC quality inspection and acceptance standards, accurately carrying out adjustments to the verticality of the tracks as well as tightening the bolts at all connection points ; The scaffolding team follows up in parallel, promptly carrying out the erection and dismantling of scaffolding to ensure efficient and orderly progress of construction. At the same time, the project team carefully refined the construction plan; by optimizing the sequence of tasks, they reduced the duration that heavy cranes were needed on site, thereby effectively cutting down the costs associated with machinery rental. During the core hoisting and alignment phase of the torch framework, the construction team employed a dual-crane collaborative operation approach to carry out this task accurately: a 1250-ton Demag crane, equipped with a super-long boom of 198 meters, successfully lifted the 19.5-meter-high seventh section of the torch framework’s steel structure ; The 600-ton Terex crane used a specialized lifting frame to safely transport the senior rigger to the installation site at a height of 149.8 meters, where they were responsible for directing the lifting operations on site. Under the joint supervision of the project owner, PMT, ERT, the general contractor, and all other involved parties, and upon the lifting command given by the chief rigger, the two cranes worked in coordination to slowly lift the seventh section of the torch framework. After a series of coordinated movements such as lifting and rotating, it was finally placed in position with precision, completing its assembly. The installation of the torch frame was completed 15 days ahead of schedule, resulting in direct savings of around $80,000 in machinery rental costs and creating favorable conditions for the efficient progress of the project.
Reply #22025-12-02
[Common Issues in Haichuan Pipeline Design] – A compilation post; images and text are being updated. Feel free to join the discussion: https://bbs.hcbbs.com/thread-5705828-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
Reply #32025-12-03
【Ten Years of Rapid Development in Chemical Engineering Equipment】2859-2025: Datong’s first-phase pilot project for the production of high-performance domestic carbon fiber of the 12K small tow T1000 grade, with an annual production capacity of 200 tons. https://bbs.hcbbs.com/thread-5706912-1-1.html (Source: Huchuan Chemical Industry Forum (Hua Hai Chuan Liu hcbbs))
Reply #42025-12-03
【Ten Years of Rapid Development in Chemical Equipment】2860-2035: Amazing! Lifting of the 220-meter-span, 3,600-ton dome grid structure in Asia’s largest \"fish-shaped\" water park – a steel structural grid system https://bbs.hcbbs.com/thread-5706919-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #52025-12-03
Currently, the tallest elevated torch in Asia is located in the UAE, with a height of 176 meters.
Reply #62025-12-04
Do you know how tall the tallest torch in China is? Where? @Haichuan Old Fish
Reply #72025-12-04
Isn’t it the 68-meter one from Guangdong Refining?
Reply #82025-12-04
According to the designers from the torch manufacturer, it is an elevated torch for the Lu’an coal indirect liquefaction project, 170 meters tall.
Reply #92025-12-05
【Ten Years of Rapid Development in Chemical Equipment】After 13 years of trial production from 2863 to 2025, a breakthrough was achieved, breaking foreign monopolies! Successful trial production of 17-meter ultra-long ultra-high-pressure steel pipes in our country https://bbs.hcbbs.com/thread-5706989-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.