HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The first synthesis reactor for the Shenhua project in Baotou, Inner Mongolia, was successfully lifted into place, marking the official start of the installation phase for the project

2025-12-13View Original

Thread Content

Recently, good news came from the Shenhua project in Baotou, Inner Mongolia, which is being constructed by the Fourth Branch of China National Chemical Engineering 16th Construction Co., Ltd.: the first synthesis reactor was successfully lifted into place, marking the official start of the installation phase and laying a solid foundation for the further progress of the project. Recently, the review of 90% of the models for the plant-wide system engineering of the Shenhua Baotou Coal-to-Olefins Upgrade Demonstration Project, the plant-wide external piping for auxiliary systems, the renovation of the thermal power plant, and the liquid material truck loading/unloading stations was successfully completed. The Shenhua Baotou Coal-to-Olefins Upgrade Demonstration Project is an upgrade and demonstration initiative carried out by Guoneng Baotou Coal Chemical Co., Ltd. on the basis of the world’s first coal-to-olefins demonstration plant, which has been in operation for many years. It is included among the major projects planned under the \"13th Five-Year Plan\" for the innovative development of the modern coal chemical industry, as outlined by the National Development and Reform Commission and the Ministry of Industry and Information Technology. The total investment planned for this upgraded demonstration project for coal-based olefins (Phase II) is 17.15 billion yuan. The project’s capacity will be 2 million tons of methanol and 750,000 tons of polyolefins per year. By being planned in conjunction with the development of new energy sources, it aims to achieve deep integration between coal chemical processing and green electricity, green hydrogen, and green oxygen. This project is also a typical demonstration project for the upgrade of the \"million-ton-scale domestic production line for coal-to-olefins across the entire process.\" It utilizes a pulverized coal gasifier developed jointly by Collin Energy and China Shenhua Coal-to-Oil Chemical Co., with a daily coal feeding capacity of 2,000 tons per furnace. This technology not only possesses complete independent intellectual property rights but also sets a new example for collaborative innovation within the industrial chain. Furthermore, the project conducted experiments for the co-combustion of coal chemical wastewater using the pulverized coal gasification process for the first time, which holds pioneering significance for the advanced, diversified, and low-carbon development of modern coal chemistry.
Reply #22025-12-13
[Haichuan Chemical Technical Documentation] How are the design temperature and design pressure of equipment and pipelines determined? https://bbs.hcbbs.com/thread-5708207-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #32025-12-13
【Ten Years of Rapid Development in Chemical Engineering Equipment】2895-2025: The Sixth Academy of Aerospace Engineering built China’s first commercial liquid hydrogen refueling station, which was officially put into operation in Panzhihua. https://bbs.hcbbs.com/thread-5708004-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
Reply #42025-12-14
【HaiChuan Safety Discussion】Hidden Dangers Around Us – Damaged Insulation Layers of Pipelines https://bbs.hcbbs.com/thread-5708255-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #52025-12-14
【Ten Years of Rapid Development in Chemical Equipment】Major breakthroughs from 2870 to 2025! China’s first pilot production line for ceramsite using coal gangue on a scale of ten million tons has been put into operation. https://bbs.hcbbs.com/thread-5707225-1-1.html (Source: HCBBS Chemical Forum)
Reply #62025-12-14
【Ten Years of Rapid Development in Chemical Engineering Equipment】China’s first zero-carbon data center that makes use of pressure energy was officially put into operation in Shaoxing, Zhejiang, from 2874 to 2025. https://bbs.hcbbs.com/thread-5707292-1-1.html (Source: HCHBBS Chemical Forum)
Reply #72025-12-15
【Ten Years of Rapid Development in Chemical Equipment】2881-2025: China’s company undertakes the general contracting for the world’s largest MTBE plant, which began operations ahead of schedule https://bbs.hcbbs.com/thread-5707365-1-1.html (Source: Haichuan Chemical Forum (Hua Hai Chuan Liu hcbbs))
Reply #82025-12-15
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – with pictures and texts; everyone is welcome to join the discussion: https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
Reply #92025-12-16
The 【Haichuan Equipment Guessing】 series will continue to be updated in 2027 – all Haichuan fans are welcome to participate actively! https://bbs.hcbbs.com/thread-2079686-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
Reply #102025-12-16
【Ten Years of Rapid Development in Chemical Engineering Equipment】From 2897 to 2025: CNOOC’s equipment development efforts led to the successful application of multi-functional robots for coating treatment of crude oil storage tanks. https://bbs.hcbbs.com/thread-5708161-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.