Thread Content
On January 5, Boiler No. 4 of the Rongsheng Jintang project, whose installation was carried out by these three companies, successfully passed its hydrostatic test on the first attempt, and Shanghai Boiler Factory Co., Ltd. sent a special congratulatory message to honor this achievement. The hydrostatic test is a crucial step in the boiler installation process for checking the quality of the equipment itself and its welds; it is also an important safety verification procedure before the boiler is put into operation. The project team strictly adhered to construction standards and technical requirements, implementing high-standard safety and quality control measures throughout the process – from ensuring the precision of equipment installation and monitoring welding quality to carrying out the testing procedures. As a result, the tests were successful on the first attempt, demonstrating the company’s technical expertise and construction management capabilities in the field of large industrial boiler installation. The letter stated that it is hoped the two sides will continue to maintain a friendly and cooperative relationship, working together to ensure the successful 168-hour trial operation of Unit 4.
【HaiChuan Safety Discussion】Compilation of Hidden Dangers Around Us – Illustrated with photos and texts; everyone is welcome to participate in the discussion. https://bbs.hcbbs.com/thread-5705518-1-1.html (Source: HaiChuan Chemical Forum (HuaHaiChuanLiu hcbbs))
【Ten Years of Rapid Development in Chemical Processing Equipment】2958-2025: Maoming Petrochemical becomes the first company in China’s petrochemical industry to have its extruders monitored in real time; the project was approved successfully. https://bbs.hcbbs.com/thread-5710592-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Engineering Equipment】2959-2026 **Successful development of technology for keeping natural gas compressors running without power interruption in pipeline systems** https://bbs.hcbbs.com/thread-5710632-1-1.html (Source: Haichuan Chemical Industry Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Engineering Equipment】The 600KW high-power magnetic levitation air compressor produced by Tianrui Heavy Industry was successfully manufactured between 2021 and 2025. https://bbs.hcbbs.com/thread-5710707-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】2962-2025: Tianyuan Company’s first domestic experimental plant for lignite carbonization in Shenmu’s coal chemical industry has been successfully put into operation. https://bbs.hcbbs.com/thread-5710802-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The bulk method ABS technology developed by Dalian University of Technology was successfully applied at Jilin Petrochemical Company from 2024 to 2026. https://bbs.hcbbs.com/thread-5710881-1-1.html (Source: Haichuan Chemical Industry Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】Yanhua Chemical’s new technology for \"constructing five new methanol distillation towers\" from 2025 to 2026 has passed **level of appraisal** https://bbs.hcbbs.com/thread-5710884-1-1.html (Source: Haichuan Chemical Forum (Hua Haichuan Liu hcbbs))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site inspections from 2966 to 2026. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))
【Ten Years of Rapid Development in Chemical Equipment】The world’s first industrial unit for high-pressure dry reforming with a capacity of 100 million cubic meters passed on-site inspections from 2966 to 2026. https://bbs.hcbbs.com/thread-5710893-1-1.html (Source: Haichuan Chemical Forum (HCBBS))