HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Key points of manufacturing control for waste heat boilers

2015-06-12View Original

Thread Content

Key points in the manufacturing control of waste heat boilers HRSG. This is my first exposure to this area; could experts please explain it? Additionally, in the ASME S case, 1. Is weld procedure qualification required for fin high-frequency welding HFRW? 2. For the fillet welds in the welding of headers and tube bundles, how can full penetration be verified? Should RT or UT be used?
Reply #22015-06-16
For the welding of high-frequency welded finned tubes, a welding process evaluation must be carried out; refer to JB/T6512 for specific details
Reply #32015-06-26
1- Welding procedure qualification is required. 2- For fillet welds, PT or MT is sufficient.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.