HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

When performing horizontal pressure testing on a vertical vessel, how are the auxiliary supports connected to the tower?

2016-07-05View Original

Thread Content

Hello everyone, I have a question. There is currently a vertical tower with a diameter of 2 meters and a length of 25 meters. A horizontal pressure test is now being conducted, with saddle supports in use. Is this saddle support placed directly under the tower? Is any other processing needed? I would be extremely grateful for your advice. Due to space constraints, only horizontal pressure testing can be carried out.
Reply #22016-07-05
A rubber pad can be placed between the arc plate of the saddle support and the surface of the tower. However, it is essential to keep all the support saddles at the same horizontal level, in order to prevent uneven stress distribution among them and avoid localized overloading of the tower structure.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.