HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

1131 Complete procedure for replacing the card assembly?

2016-03-22View Original

Thread Content

There is a 3625 card on the ITCC rack that occasionally reports faults; checks of other circuits show no problems. Technicians from the manufacturer came to assist, stating that the quality of the 3625 cards is unstable and suggesting an upgrade to 3664 cards. The problem is that there is now a 3664 card available as a spare, but how can this spare be installed when the PLC is shut down? What settings are required for the 1131 program? Looking for a replacement procedure that is efficient and reliable? Let’s discuss this together.
Reply #22016-06-13
It is said that the 3625 supports triple redundancy, making it suitable for large-scale units, while the 3664 cannot fully replace the 3625. No specific specifications have been found.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.