HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Who can provide a record sheet of your company’s regular shutdowns of rotating equipment

2016-10-21View Original

Thread Content

Our company requires that the motorized equipment be switched over once a month. We would like to keep a professional record of this process, including the time of switching, which device is being switched from and to, the operating time, and the reasons for not switching certain devices. If anyone has a suitable template, please feel free to share it; I’d be very grateful:D
Reply #22016-10-21
My workshop requires a switch every two weeks.
Reply #32016-10-21
Is there a relevant record form? I’ll give it to you, thank you
Reply #42016-10-21
We have an inspection system; after switching, the data recording is adjusted to the other device. There are no tables.
Reply #52016-10-21
Just create a table in Excel by yourself, that’s it. We have a record sheet for the operating equipment, which is filled out every two hours.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.