HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Question regarding coking fuel gas

2016-11-27View Original

Thread Content

In the past, coking was carried out by burning coking dry gas, with natural gas being added when the amount was low. In the current design for coking, there is no absorption and stabilization system; the rich gas from coking passes through a diesel absorption tower and then through a desulfurization tower before entering the fuel gas pipeline. Will this make it difficult to operate the furnace? . . I hope everyone can help answer this. Thank you:):):)
Reply #22016-11-27
I really haven’t used this before. What does it mean by no absorption stabilization system?
Reply #32016-11-27
I’ve also never seen any designs prepared by design institutes that lack absorption towers, separation towers, or stabilization towers; moreover, the dry gas and liquefied gas are not separated
Reply #42016-11-27
I’ve never seen this kind; ours has absorption and stability.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.