HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Selection of purging pressure and design pressure before putting a pressure vessel into operation

2016-12-08View Original

Thread Content

Usually, before a device is put into operation, it needs to withstand steam purging. Assuming that the design pressure of this device is 0.6 MPa(G) and the design temperature is 90°C, the equipment was designed based on a pressure of 0.6 MPa(G), and the wall thickness calculations were also satisfactory. However, the process requirements for withstanding steam purging specify conditions of P=1.6 MPa(G) and T=210°C. How should the thickness of the device itself be verified in such cases?
Reply #22016-12-08
This post was last edited by xlxuiin on 2016-12-8 at 11:08. It is designed and verified based on the purging conditions. The equipment team should communicate thoroughly with the process engineering department before design; the process engineering department should specify all operating conditions and requirements, after which the design can proceed.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.