HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Settlement monitoring device

2016-12-29View Original

Thread Content

This post was last edited by liudongday on 2017-2-15 at 12:00. The Design Code for Vertical Cylindrical Welded Steel Oil Tanks GB50341 requires that settlement observation devices be installed at the lower part of the tank wall. The use of the word “should” in this standard implies that it is not mandatory to install such devices; so under what circumstances is their installation necessary? Are there relevant guidelines to support this, and what are the specific practices? How is it represented in the drawings? If any expert has relevant drawings or photos, please share them.
Reply #22016-12-29
In practice, it is easy to measure settlement as long as the elevation before basic settlement is known.
Reply #32016-12-30
The elevations are all determined using several other relatively stable reference points within the factory.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.