HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Why must piling machine operators monitor from a distance of 5 meters away from the center of the pile hammer?

2023-07-23View Original

Thread Content

There should be no high-voltage lines within the piling machine’s operating area. The work area should have clear signs or barriers, and unauthorized personnel are not allowed to enter. During the driving of the pile hammer, the operator must monitor from a distance of more than 5 meters from the center of the pile hammer. Why must piling machine operators monitor from a distance of 5 meters away from the center of the pile hammer?
Reply #22023-07-25
1. No one is allowed to stand within the mechanical rotation radius; 2. Prevent injuries caused by objects during the operation process ; It is possible to observe the conditions during operation as well as the ground at the operation site from a distance of 3 to 5 meters

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.