I would like to ask the experts: is it required to provide inspection reports for pressure pipelines and fittings when notified by the natural gas pipeline construction office? Which standard applies to which item?
TSG D7001-2013 Rules for Supervision and Inspection of Manufacturing of Pressure Pipeline Components is suspended from implementation. . Notice from the General Office of the Quality Inspection Administration on Suspending the Implementation of the \"Rules for Supervisory Inspection of Pressure Pipeline Components Manufacturing\" (Quality Inspection Office Special Letter [2013] No. 583) To the Quality and Technical Supervision Bureaus of all provinces, autonomous regions, municipalities directly under the Central Government, and the Xinjiang Production and Construction Corps, as well as to all relevant entities: The \"Rules for Supervisory Inspection of Pressure Pipeline Components Manufacturing\" (TSG D7001-2013) (hereinafter referred to as the \"Supervisory Inspection Rules\") were originally scheduled to come into effect on July 1, 2013. To implement the requirements of the \"State Council’s Plan for Institutional Reform and Functional Transformation,\" the General Administration is carrying out reforms related to the administrative approval process for special equipment as well as changes in related functions. It is also studying ways to reform the system of administrative permits, with the intention of eliminating or adjusting certain manufacturing permit requirements for pressure pipeline components as specified in the \"Inspection and Testing Rules.\" To ensure that the implementation of the Supervision and Inspection Rules is in line with and coordinated with the reforms regarding the licensing process for pressure pipeline components, it has been decided, after consideration, to postpone the implementation of these Rules. This is to inform you. General Office of the Quality Inspection Administration, June 13, 2013
Suspend implementation, but is it still necessary to carry out supervision and inspection in accordance with the old supervision procedures?
The first question concerns what needs to be done regarding notifications related to pipelines. Gas pipelines fall under category GB1 among public pipelines, and the requirements vary from province to province. If they are used for civilian purposes, they are under the jurisdiction of the Construction Bureau; these are pipelines managed by the Public Utilities Department affiliated with the Construction Bureau, as they are considered public utilities. However, if they are used within enterprises, then they fall under the category of industrial pipelines, namely grade GC. Industrial pipelines of grade GC are under the supervision of the Quality Supervision Bureau. Whether they are classified as GB or GC, inspections are necessary. The supervision inspections after pipeline installation should comply with the following documents: Regulations on the Safety Management and Supervision of Pressure Pipelines, and Rules for Safety and Quality Supervision Inspections of Pressure Pipeline Installation. This latter document includes an attachment – a template for inspection reports. According to this template, it is required to confirm the material used; please see below