Thread Content
This post was last edited by francks on 2017-9-16 23:06 and has been resolved. Thank you.
I think, just to be safe, let’s re-pressurize it.
Could the original poster share how it was specifically resolved?
This post was last edited by cjgj008 on 2017-9-18 at 11:01. It’s not just a matter of pressure testing; if the system was completed 4 years ago (pressure pipe inspections should have been carried out before completion), the validity period for such inspections is generally three years (you can check the validity period indicated on your pressure pipe inspection report). Now that the system is to be put into use, supervision inspections of the pressure pipes are required, so it’s more than just pressure testing. If the device’s pipes do not fall under the category of pressure pipes, then that’s a different matter; even in such cases, it is still recommended to conduct a pressure test.
Could I know how to solve it?
When there are doubts about safety, it is recommended to conduct a pressure test again
As soon as the problem is raised, it’s immediately solved. What a weird post!
There are instructions available at http://www.baidu.com/link?url=7NyWQpu8Damr9JD6xvcKpYDBte3LEQh6-CHmWtrQHX9JeoAe9wusjT00QmbuOw1ysBTEM8zvTHYtvRjPbTwZQ3C0GGSpwkLz3qYcvO2a0-iaA9GxqPBVMUf3c5Z6Dsuv&wd=&eqid=fa41e955000079360000000659c1d903: pressure testing must be carried out again if the system has been out of use for more than 2 years.
The regulations for regular inspection of industrial pipelines state that if they have been out of use for more than 2 years, they must undergo pressure testing again. http://www.aqsiq.gov.cn/xxgk_13386/xxgkztfl/zcfg/201210/t20121017_260344.htm