Piping design sequence

2019-04-02View Original

Thread Content

I’m not sure; should larger pipes be used first when considering pipe layout?
Reply #22019-04-02
https://bbs.hcbbs.com/thread-1256641-1-1.html I recommend that you refer to this post.
Reply #32019-04-02
First, stress screening is carried out; large-diameter pipes that are subject to high temperature and pressure are installed first, followed by stress calculations. Priority is given to the main pipes of equipment such as compressors, turbines, and heating furnaces, with the process following a sequential order.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.