I’d like to ask everyone, how long does it generally take to create the drawings for a piece of equipment?

2024-12-04View Original

Thread Content

I’ve just started in this field and am still in the learning stage. I’d like to ask everyone: for basic equipment such as storage tanks and shell-and-tube heat exchangers, once one is proficient enough to start working on designs after obtaining the equipment’s data sheets, how long does it generally take to produce the final drawings?
Reply #22024-12-04
The design and drawing time for basic equipment such as storage tanks or shell-and-tube heat exchangers mainly depends on the specific design complexity and the individual’s proficiency. Generally speaking, for a simple design and when the designer is highly skilled, it may take 1 to 3 days from receiving the data sheet to completing the drawings. If the design is complex or still in the learning* phase, it may take a week or even longer. .
Reply #32024-12-04
For ordinary storage tanks, the total time required for calibration and review is 200 man-hours (excluding the platform). The exact time it takes to complete the work varies from person to person
Reply #42024-12-05
Storage tank: 5-8 days, heat exchanger: 8-12 days
Reply #52024-12-05
Storage tank: 3-5 days, heat exchanger: 7 days
Reply #62024-12-05
25 working days? I’m afraid I won’t even be able to drink porridge.
Reply #72024-12-05
Being able to draw quickly is your skill; they’ve allocated 200 hours in total for review and editing – and you still think that’s too much?
Reply #82024-12-05
It depends on the person, as well as the company. On average, two factors come into play: one is the number of man-hours specified in the quote, and the other is the number of man-hours required by the client. The more mature the drawing software used is, and the better its capabilities for further development, the more efficient the work can be. For calculation plus design drawings (assuming that, due to national conditions, the drawings prepared by the designers and those prepared by the contractors might be different), it generally takes around 10 days, provided that the quality of design review is satisfactory
Reply #92024-12-05
Do you know how much an hour of design work costs? If the standard rate of 100 yuan per hour is applied, the design cost for a regular storage tank is 20,000 yuan. Then, which client would be willing to pay such a high design fee? Which boss would pay such a salary? Do you think everyone in the world is like Lei Feng?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.