HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Installation of the primary production facility for vehicle urea products at Meifeng Fertilizer’s urea plant has been completed

2019-08-30View Original

Thread Content

Installation of new primary production facility for vehicle urea product completed at Meifeng Fertilizer’s urea plant / Author/Source: Meifeng Chemical Co., Ltd. Date: 2019-08-29 Clicks: 29. The technical upgrade project to add a primary production facility for vehicle urea products to Meifeng Fertilizer’s plant, which has an annual urea production capacity of 300,000 tons, was completed after more than two months of intensive work on design, material procurement, and on-site construction. As of August 22, all equipment, process pipelines, and instrumentation had been installed and connected to the production system; once the system testing for leaks and pipeline flushing are finished, the plant can begin trial operations.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.