HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

【Piping Valve Technical Edition – Daily Question on Common Piping Errors】20170723

2017-07-23View Original

Thread Content

Discussion on Common Piping Errors 007: Which of the following designs (fire steam, flushing water quick connectors) is correct? A. B. Answer: B. Fire steam and flushing water quick connectors should not be directed at the operator, and their location should be as close as possible to the entrance side of the platform. PS: Excerpted from the Chemical Pipeline Design Manual
Reply #22017-07-23
Discussion on Common Piping Errors 007: Which of the following designs (fire steam, flushing water quick connectors) is correct? A.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.