HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

Logical ladder diagram design

2017-03-21View Original

Thread Content

Requirements: A sink, an high-level alarm switch X1, a low-level alarm switch X2, and a water pump Y. The pump should start when a high-level alarm is detected, and it should stop when a low-level alarm is detected. In abnormal situations, when both high-level and low-level alarms occur simultaneously, the pump should still start. Draw the ladder diagram
Reply #22017-03-22
This post was last edited by zzllyp on 2017-3-22 07:03 --X1-----------|--------------(SET Y) --X1-----X2--| --X2-----(NOT X1)---------(RESET Y)
Reply #32017-03-22
The logic can be summarized as: Overreporting – trigger command; Underreporting and not overreporting – stop command
Reply #42017-03-22
The logic can be summarized as: Overreporting – trigger command; Underreporting and not overreporting – stop command
Reply #52017-03-22
It should be simple logic, right?

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.