HCBBS Forum (English)
Submit Chemical Projects / Find Solutions
Amplify Your Requirements on a Broader Chemical Platform *Engineering · Technology · Equipment · Solutions*
Submit Request

The No. 1 boiler at Inner Mongolia JiuTai New Materials was successfully ignited for trial operation

2020-08-03View Original

Thread Content

Successful Commissioning of Boiler No. 1 at Inner Mongolia Jutai New Materials Author/Source: Inner Mongolia Jutai New Materials Date: July 30, 2020 Clicks: 112 On July 29, the company held a ceremony to initiate and heat up Boiler No. 1 in the power generation area of the project designed to produce 1 million tons of ethylene glycol per year. As Secretary Wang Lixia, Deputy Director Huang Zhiqiang, and Chairman Cui Lianguo jointly pressed the ignition button, Unit 1 boiler came online with a loud roar; a fierce flame ignited inside the furnace. The ignition test was successful, marking the transition of the project from equipment installation to the stage of individual unit testing.

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.