Public Notice on the Environmental Impact Assessment for the Natural Gas-Based Chemical New Materials Project of Shaanxi Coal and Chemical Industry Group Xinjiang Co., Ltd. in Korla
Thread Content
Public Notice on the Environmental Impact Assessment for the Korla Natural Gas-Based Chemical New Materials Project of Shaanxi Coal and Chemical Industry Group Xinjiang Co., Ltd. Author/Source: Xinjiang Ecology and Environment Protection Industry Association Date: 2022-04-16 Clicks: 17 On April 13, 2022, Shaanxi Coal and Chemical Industry Group Xinjiang Co., Ltd. entrusted Liaoning Provincial Environmental Planning Institute Co., Ltd. with carrying out the environmental impact assessment for the “Korla Natural Gas-Based Chemical New Materials Project” of this company. To safeguard the legitimate environmental rights and interests of the public, enhance the scientific nature and relevance of environmental impact assessments, and improve the rationality and effectiveness of environmental protection measures. In accordance with the relevant provisions of the Environmental Impact Assessment Law of the People’s Republic of China and the Measures for Public Participation in Environmental Impact Assessment (Ministry Order No. 4), a first public announcement is being made regarding the environmental impact assessment of this project, in order to make the relevant information on the environmental assessment available to the public and to seek their opinions and suggestions. The details listed are as follows: 1. Basic information such as the project name, location selection, route determination, and construction scope. Project name: Korla Natural Gas-to-Chemical New Materials Project of Shaanxi Coal and Chemical Industry Group Xinjiang Co., Ltd. Project location: Shangku Petroleum and Petrochemical Industrial Park, Korla City, Bayingolin Mongol Autonomous Prefecture, Xinjiang. Project nature: New construction. Project scale: Plans to build 2×50,000 tons/year natural gas-to-acetylene plants ; 300,000 tons/year hydrogen production plant using methanol and acetylene off-gases ; 3×240,000 tons/year formaldehyde plants ; 3×104,000 tons/year BDO plant ; 2×60,000 tons/year PBAT / 2×50,000 tons/year PBS plants ; 4×46,000 tons/year PTMEG plant ; It consists of a 30,000 tons/year GBL/NMP plant, among other things. Supporting facilities include a 220KV main substation, regional power distribution stations, a central control room, cabinet rooms, a circulating water station, an air separation and air compression station, a refrigeration station, a comprehensive pump station, a reclaimed water station, a desalinated water station, a sewage treatment station, fire accident ponds and rainwater monitoring ponds, as well as incineration and flare systems. At the same time, a formaldehyde intermediate tank area, a BDO intermediate tank area, methanol and n-butanol tank groups, BDO raw material and finished product tank areas, chemical loading/unloading platforms, a chemical warehouse, a hazardous waste warehouse, a general warehouse, and a maintenance workshop will be constructed. II. Name and contact information of the project developer The name of the project developer: Shaanxi Coal and Chemical Industry Group Xinjiang Co., Ltd. Contact person at the project developer’s office: Engineer Ma. Contact number: 15991172649. Address of the project developer: 24th floor, Xinzhou Apartment, No. 426, Suzhou East Street, Xincheng District, Urumqi, Xinjiang.III. Name and contact information of the agency responsible for preparing the environmental impact assessment Report The name of the agency: Liaoning Provincial Environmental Planning Institute Co., Ltd. Contact person at this agency: Engineer Zhang. Contact number: 13609926633. Postal code: 110000. Address of the agency: No. 34, Chongshan East Road, Huanggu District, Shenyang City, Liaoning Province