Datang Fuxin Coal-to-Natural Gas Public Works Center: First commissioning of the evaporative crystallization unit compressor successful

2020-08-04View Original

Thread Content

Datang Fuxin Coal-to-Natural Gas Public Utilities Center: Successful first commissioning of the evaporation crystallization unit compressor. Author/Source: Datang Fuxin Coal-to-Natural Gas. Date: 2020-08-02. Clicks: 25. At 09:28 on July 30, with the issuance of the commissioning command, the commissioning process for the compressor in the evaporation crystallization unit at the Public Utilities Center began. The single-unit commissioning was completed after 2 hours and 50 minutes; the results showed that the unit was operating well, and the commissioning was successful – the unit was ready for production use. ▲ To ensure the successful first commissioning of the compressor, the center carried out comprehensive planning and meticulous organization; it established a dedicated commissioning team, developed a commissioning plan, and held multiple special meetings to discuss the issues that hindered the commissioning process. Due to the suspension of the project, the equipment was left in place for an extended period without any rotation or maintenance being carried out. Moreover, it had exceeded both the warranty period and the commissioning service period. The center made every effort to overcome these difficulties, took proactive steps to address the challenges, and, in the absence of on-site guidance from the manufacturer, conducted inspections and maintenance through discussions and risk assessments. In collaboration with the Mechanical Power Department and the engineering company, they managed to complete the individual unit tests, saving the company hundreds of thousands of yuan in costs related to equipment maintenance and commissioning support. Identify problems and eliminate risks. During the inspection, the equipment specialist detected localized rust inside the gearbox and on the bearing caps. Repair work was carried out promptly. Considering that this model has a cantilever structure and may have issues such as shaft bending due to prolonged use, a thorough inspection and maintenance of all components of the gearbox were conducted. Tasks including shaft runout testing, measurement of the clearance in the support bearings, measurement and maintenance of the tilting-pad bearings, measurement of the clearance in the gear thrust discs, measurement of the gear meshing clearance, and measurement of the gear meshing area were carried out to eliminate potential safety hazards and ensure proper lubrication and oil circulation of the equipment. Ensure oil transportation and maintain safety. Equipment lubrication is a crucial aspect for ensuring the safety of equipment and the stable operation of systems, and it constitutes a core element of intrinsic safety. The equipment specialist guided the operators through each step of the process – from steam purging of the oil pipelines, to purging and drying with compressed air, and finally to the cleaning of the oil tanks – ensuring that the oil system was cleaned to high standards and with quality assurance. In the oil circulation and filtration process, the filters were replaced 108 times in 3 locations, and the filter elements of the oil purifiers were cleaned 6 times. After verification that everything was in order, the oil was sent to an analysis center for testing to ensure its quality. After more than 100 days of effort, the Public Utilities Center successfully completed the individual commissioning of the domestic centrifugal compressor SKV50-1H used in Unit 1# evaporation crystallization process. It is reported that this compression unit is an important component of the evaporation and crystallization system in wastewater treatment; when the system is operating properly, it supplies 36,000 kg of low-pressure steam to the evaporator per hour. In this \"battle\" of compressor commissioning, the team involved showed a determination to take on tough challenges and go all out to overcome difficulties. The center will use this as an opportunity to continue focusing on completing the remaining tasks of the project as well as the operation and testing of subsequent large-scale units, striving unremittingly to help Fuxin Company achieve its goal of full development.
Reply #22020-08-07
Not bad, not bad. Relatively speaking, Datang’s coal chemical industry has faced some difficulties

Submit a Project

**Looking for Chemical Technology, Equipment & Solutions?** No Registration Required Broader Platform Exposure | Global Chemical Service Provider Connections

Submit Request — Free Consultation

Disclaimer

This is an automated machine translation of the original thread. Some technical terms may have inaccuracies; the original text shall prevail. Click "View Original" at the top right to access the source page, which supports IP-based automatic real-time language translation. Please watch out for contact details and sales inducements to prevent fraud. All content and translations are for reference only, representing solely the poster's personal views. For enquiries, email service@hcbbs.com.