Thread Content
The last edit to this post was made by qy576100527 on March 18, 2021, at 16:03. On March 12, the launch ceremony for Hantang Energy’s 500,000 tons per year methanol-to-ethanol production project and related industrial integration project was held in Gaoshawo Town. Ningxia HanTang Energy Technology Co., Ltd. plans to invest a total of 2.185 billion yuan in the HanTang Energy project, which aims to produce 500,000 tons of ethanol per year through methanol conversion, as well as to integrate related industrial processes. The construction of this project will take place over three phases, with distillation and extractive distillation methods being primarily used to carry out the green and efficient separation of purchased waste alcohol using a low-carbon alcohol-water mixture, thereby enabling the recycling of hazardous waste. A heat center will also be established to provide heating for this company itself, as well as to supply centralized, green heating to other enterprises in the industrial park. “Once completed and put into operation, this project will be able to generate annual revenues of 5 billion yuan, profits of 800 million yuan, and tax payments of 300 million yuan; it will also provide employment for 300 people. Project Name and Overview ⑴ Project Name: Ningxia HanTang Energy Technology Co., Ltd.’s 500,000 tons per year methanol-to-ethanol production project and related industrial chain integration project. ⑵ Location: The project is located in Block 3 of the Yanchi County Industrial Park in the Ningxia Hui Autonomous Region; the geographic coordinates of the project site are N 38°01’22.80” and E 107°03’42.81”. ⑶Project Overview Ningxia HanTang Energy Technology Co., Ltd. is located in Block 3 of the Industrial Park in Yanchi County, Ningxia Hui Autonomous Region. The facilities under this project consist of 5 units in total: a 500,000-ton/year methanol to ethanol production plant, a 1.2 million-ton/year aromatic compounds processing plant, a 400,000-ton/year heavy oil hydroprocessing plant, and a 600,000-ton/year mixed alcohol separation plant. The 500,000 tons/year methanol-to-ethanol plant includes a 10×104 Nm3/h natural gas to syngas unit, a 10×104 Nm3/h syngas separation unit, an 80×104 Nm3/h carbonylation unit, a 50×104 tons/year hydrogenation unit, a 50×104 tons/year separation unit, and a compression unit. The 1.2 million tons/year aromatic compound complex includes a 120×104 tons/year naphtha hydrogenation unit, a 30×104 tons/year alkane dehydrogenation unit, a 25×104 tons/year aromatic extraction unit, and a 10,000 Nm3/h PSA unit. The 400,000 tons/year heavy oil hydroprocessing unit includes a 5,000 Nm3/h methanol-to-hydrogen production unit, a 60×10^4 tons/year feedstock pretreatment unit, and a 40×10^4 tons/year heavy oil hydroprocessing unit. The total land area of the project is 789,600 m2, with a total investment of 2,185,430,400 yuan.