Thread Content
**Bid Announcement for Furnace Construction and Heating Projects at Plant 1 and Plant 2 for Coal-to-Oil Production in Ningxia Coal Industry Co., Ltd., an Energy Group Company. Author/Source: Date: 2022-05-19 Clicks: 4 2. Project Overview and Scope of Bidding 2.1 Project Overview, Scope of Bidding, and Division into Bids/Contracts: Project Overview: The gasification units at Plant 1 and Plant 2 of this project include 28 gasifiers, while the coal preparation units consist of 42 hot air stoves; Since the gasification furnace and hot blast stove began operating with feed in October 2016, the refractory materials in their main structures have begun to fall off. After replacing or repairing the slag tap, the ramming material must be re-poured. To ensure the long-term stable operation of the gasifier and hot air stove, external maintenance services for constructing these units are required. Scope of the tender: It includes the bidder’s responsibility for carrying out the overall or partial construction and drying of 28 gasification furnaces, with an estimated workload of around 1145 m2. Responsible for the overall or partial shotcreting repairs of 42 hot blast stove bodies and their outlet pipelines; the estimated workload is approximately 527 m². The bidder shall purchase personal accident insurance for its staff, with the compensation limit being at least the following amount: RMB 1 million per person in case of death or disability ; The medical cost is 200,000 RMB per person. For other requirements, please refer to the technical annex. 2.2 Others: Project location: Coal chemical industry base, Ningdong Town, Lingwu City, Ningxia Hui Autonomous Region. Planned service period: 3 years. The actual start date shall be subject to the notice from the tenderer. (The overall construction period for each gasifier is 10 days, while that for each hot blast stove is 5 days.) Assessments are conducted annually during the contract period; if the assessment is successful, the contract continues to be in effect. If the assessment fails, the tendering party has the right to terminate the contract unilaterally. The execution of the contract shall be terminated when the cumulative total amount under the contract reaches but does not exceed the provisional total amount stipulated in the contract, or when the valid expiration date specified in the contract is reached; whichever occurs first. 3. Qualification requirements for bidders 3.1 Qualification conditions and performance requirements: [1] Qualification requirements: (1) The bidder must be an independently registered legal entity or other organization, and must provide valid proof documents. (2) Bidders must possess and provide a valid Qualification Certificate for General Contracting of Metallurgical Engineering Projects at Level 3 or above, or a Qualification Certificate for General Contracting of Petrochemical Engineering Projects at Level 3 or above. (3) The bidder must possess and provide a valid work safety license. 【2】Financial requirements: / 【3】Performance requirements: From January 1, 2017, up to the date of publication of this announcement (subject to the contract signing date), bidders must have at least 2 contracts related to the construction or lining (refractory materials) maintenance of industrial furnaces, combustion furnaces, gasification furnaces, hot air furnaces, or boilers in the coal chemical industry, power plant industry, or metallurgy industry. Bidders must provide scanned copies of contracts that demonstrate compliance with the performance requirements for this tender; these scanned copies must include at least the pages bearing the signatures of both parties to the contract, the date the contract was signed, and the key information related to the performance requirements. 【4】Credit requirements: / 【5】Qualification requirements for the project leader: / 【6】Requirements for other key personnel: / 【7】Equipment requirements: / 【8】Other requirements: / Note: Qualifications and performance records of parent and subsidiary companies cannot be used interchangeably. 3.2 Joint bids are not accepted for this project. 4. The deadline for purchasing the tender documents is 2022-05-17 09:00:00, while the purchase period for these documents runs until 2022-05-23 16:30:00. *The price for each set of tender documents is RMB 1,000.0 per package/bid section for Package/Bid Section 1; no refunds will be made after purchase. *